
Applications
- >1000
SSS Clutches supplied into UPS systems
- 400 MW
The highest power SSS Clutch in operation
- >50 years
Continuous service from an SSS Clutch

Designed for reliability
How the SSS Clutch worksFeatured case study
Net Zero Teesside
Net Zero Teesside (NZT) aims to be the world’s 1st commercial power station with carbon capture and storage (CCS). The power plant will use a GE Vernova 9HA.02 gas turbine in a Single-Shaft Combined Cycle format with an SSS Clutch
